After applying for an electricity meter, the waiting can feel endless if you do not know where your case stands. IESCO new connection tracking solves that. With your tracking ID or CNIC, you can check your application status online in under a minute, without visiting an office. You can see whether the site survey is done, whether a demand notice is ready, and whether the case has moved to installation.
This guide shows you exactly where to check, which details the official tracking page asks for, and how to read each stage of the process. It also explains whether there is an official IESCO new connection tracking app, the common reasons applications get delayed, and what to do if you lose your tracking ID. Finally, it covers when and how to approach your subdivision office for help.
How IESCO New Connection Tracking Works
Every new connection application is recorded in PITC’s Electricity New Connection (ENC) system. IESCO has its own section of this system, and that is where you check progress.
What You Need Before You Check
- Tracking ID: the application or tracking number you received when you applied. Keep it from the app, the facilitation center slip or your printed form.
- Or your CNIC number: the CNIC of the applicant, typed without dashes.
- A phone or computer with internet access.
Where to Track: The Official ENC Portal
The main portal at enc.com.pk shows a notice telling IESCO consumers to use iesco.enc.com.pk. On that IESCO portal, the top menu includes Track, Print Form, Print DN, Pay DN and Upload DN. Whether you call it an IESCO new meter connection status check online or simply tracking your file, it is done from the Track option. Always type the address yourself or use the official IESCO website, rather than links from social media.
IESCO New Connection Tracking Online: Step by Step
The tracking page is simple. When we checked it, it had a company list and two ways to search.
Tracking With Your Tracking ID
- Open iesco.enc.com.pk and click Track.
- Under Select Application Type, choose New Connection. The other option is for changes of name, tariff or load.
- In Company, select IESCO.
- Choose the Tracking Id option and enter your tracking ID.
- Press Submit and read the status shown for your application.
Tracking With Your CNIC
If you cannot find your tracking ID, use the second option on the same page:
- Follow steps 1–3 above.
- Choose the CNIC option.
- Enter the applicant’s CNIC without dashes, for example, 3740512345678 rather than 37405-1234567-8.
- Press Submit.
Use the CNIC of the person named on the application. If a family member applied in their name, your own CNIC will not find the case.
Printing Your Form and Demand Notice
The same portal has Print Form for downloading your submitted application and Print DN for printing your demand notice once it is issued. After paying, Upload DN lets you submit the paid copy. The portal’s Downloads section also provides blank forms, including a specimen NOC and an affidavit, if your case needs them.
Stages of a New Connection and What Each Status Means
The exact wording on the tracking page can differ, but every application moves through the same main stages. Here is what each one means and what you should do.
Application Submitted
Your application has been recorded in the ENC system and has a tracking ID. Nothing is required from you yet, apart from keeping your documents ready for the survey. If your case stays at this stage for a long time, check that all documents, including the wiring test report, were attached.
Site Survey and Document Check
IESCO field staff visit your premises to check the address, the required load and the distance from the nearest pole or transformer. They may also collect hard copies of your documents. Make sure someone is available at the site with original documents and that your phone is switched on.
Demand Notice Issued
Once the survey and checks are complete, IESCO issues a demand notice listing the charges, such as material cost and security deposit. Print it with Print DN and check the amount and validity date. Our guide to the IESCO new connection fee and documents explains these charges.
Demand Notice Paid
After you pay through Pay DN or an allowed payment channel, upload the paid copy with Upload DN or hand it to the facilitation center. This is an important milestone. Under NEPRA’s Performance Standards (Distribution) Rules 2005, read with the Consumer Service Manual, IESCO must provide the connection within 20 days of payment for loads up to 15 kW, and within 34 days for loads above 15 kW and up to 70 kW.
Meter Installed and Energised
The meter is fixed at your premises and connected to the supply, so your connection is energised. Your first bill will show your new 14-digit reference number. Save it, and use our IESCO bill checker to view future bills.
Example: Sara paid her demand notice for a 3 kW home connection on 1 March. If her tracking page still shows no installation by 21 March, her case is past the 20-day limit, and she has good grounds to follow up.
Is There an IESCO New Connection Tracking App?
Many people search for an IESCO new connection tracking app. Here is what is officially available.
IESCO Smart and Power Smart
IESCO Smart is an app published by PITC. Its app store listing says it supports power sector services including new connection, change of attributes and meter change requests. The IESCO ENC portal itself asks applicants to use the Power Smart or IESCO Smart app and eOps for applications. If you applied through one of these apps, check your application there first. If the app does not show a clear status, use the Track page on iesco.enc.com.pk with your tracking ID or CNIC. Download apps only from the official Google Play or App Store listings published by PITC, and avoid unofficial “tracking” apps that ask for your CNIC.
Why Your Application Is Delayed
If the tracking page shows no progress for a long time, one of these is usually the reason.
Common Delay Reasons
- Incomplete documents: missing ownership proof, approved map or NOC.
- No wiring test report: NEPRA has noted that this report should be submitted with the application form, and a missing report can delay processing.
- Survey problems: the site was locked, the address was unclear or your phone was unreachable.
- Demand notice not paid or not uploaded: the installation clock starts only after payment, so check that the paid copy was uploaded.
- Expired demand notice: if the validity date passed before payment, ask the office about a fresh notice.
- Material shortage: sometimes meters or transformers are not available. NEPRA’s decisions say the company should inform the applicant about this.
What to Do When Tracking Does Not Help
Sometimes you need more than the tracking page.
Lost Tracking ID or Status Not Updating
- Lost tracking ID: search by the applicant’s CNIC on the Track page. Also check the app, your SMS messages and any slip from the facilitation center.
- Status not updating: try again after a day or two, as office updates can take time. If nothing changes and you have completed your part, contact the office.
- Login or portal problems: the IESCO ENC portal lists focal persons for ENC and eOps on its home page. Use the details shown there at the time you visit.
Contacting Your Subdivision Office
Visit your subdivision office or the Customer Facilitation Center that handled your case if:
- The survey has not happened after a reasonable wait.
- Your demand notice is paid but the meter is not installed within NEPRA’s timeline.
- The tracking status shows an objection you do not understand.
Take your tracking ID, CNIC, application printout and paid demand notice. If the office does not help, register a complaint on 118 using our IESCO complaint guide, and keep the complaint number. For other contacts, see our IESCO helpline guide.
Frequently Asked Questions
How can I check my IESCO new connection status online?
Open iesco.enc.com.pk, click Track, choose New Connection and IESCO, then search with your tracking ID or the applicant’s CNIC without dashes.
Can I track my IESCO new connection with my CNIC?
Yes. The Track page has a CNIC option. Enter the CNIC of the person named on the application, without dashes.
Is there an official IESCO new connection tracking app?
IESCO Smart and Power Smart are PITC apps that support new connection services. If the app does not show a clear status, use the Track page on iesco.enc.com.pk.
How long after paying the demand notice will my meter be installed?
Under NEPRA’s rules, within 20 days for loads up to 15 kW and within 34 days for loads above 15 kW and up to 70 kW.
What should I do if my tracking status is not changing?
Check that your documents are complete and your paid demand notice is uploaded. If everything is done, visit your subdivision office with your tracking ID and receipts, then complain on 118 if needed.
Conclusion
IESCO new connection tracking takes only a minute once you know where to look. Use the Track option on iesco.enc.com.pk with your tracking ID or the applicant’s CNIC, and read each stage to know your next step. Keep documents complete, upload the paid demand notice, and note the date you paid, since NEPRA’s 20-day or 34-day limit starts then. If the status stops moving, take your paperwork to the subdivision office, and complain on 118 if needed.