Once IESCO has surveyed your site for a new connection or load extension, the next step is a bill-like document called the IESCO demand notice. It tells you exactly how much to pay before the work can go ahead. Many applicants lose weeks because they miss its deadline, pay at the wrong place or forget to submit the paid copy. A few minutes of understanding can save you that delay.
This guide explains what a demand notice is, the charges it can include, and how to print it from IESCO’s official ENC portal. It covers the demand notice payment process and how to confirm your payment was received. It also explains the 30-day validity and grace period, what happens after payment, demand notices for load extension, and how a security deposit is refunded when a connection is permanently disconnected.
What Is an IESCO Demand Notice?
A demand notice (often shortened to DN) is IESCO’s formal request for the charges needed to provide or change your electricity connection.
Why IESCO Issues a Demand Notice
Providing a connection needs materials, labour and a deposit to secure future bills. The demand notice lists these costs so you can pay them before IESCO installs anything. NEPRA’s Consumer Service Manual (CSM), which IESCO publishes on its website, says no estimate or demand notice should be issued without details. In practice, this means you should always see what each amount is for.
When You Receive It in the Process
The demand notice comes after you have applied and IESCO has completed the site survey and document checks. It is issued for:
- A new connection, such as a new home, shop or other premises
- A load extension, when you need a higher sanctioned load on an existing connection
If you have not applied yet, start with our guide to the IESCO new connection process.
What the IESCO Demand Notice Fee Includes
There is no single IESCO demand notice fee for everyone. The amount depends on your load, the materials needed and your location. According to the CSM, demand notices for connection charges and the security deposit are issued together.
Material and Service Connection Charges
Clause 2.5 of the CSM sets out how connection charges are worked out:
| Charge | How it is calculated (CSM) |
|---|---|
| Material | Actual cost of material, including 12% store handling charges (called “X”) |
| Installation charges | 8% of X |
| Electrification design vetting | 1.5% of X, only for housing societies, plazas, high-rise and commercial buildings |
Material usually means items such as the meter, cable and any extra poles or wire. The further your premises is from the nearest pole, the more material you may need.
Security Deposit
The security deposit is held by IESCO against your future bills. It depends on your sanctioned load and whether your area is urban or rural. The Ministry of Energy (Power Division) gives these examples:
| Connection | Urban | Rural |
|---|---|---|
| Single phase, 3 kW | Rs. 3,660 | Rs. 1,830 |
| Three phase, 5 kW | Rs. 6,100 | Rs. 3,050 |
These are official examples, not a guaranteed rate for every case. Your own demand notice shows the exact amount.
Is There an Official Demand Notice Fee Calculator?
When we checked IESCO’s ENC portal, it offered tracking, form printing and demand notice options, but no public calculator for new connection fees. We have not found an official IESCO new connection demand notice fee calculator. You can make a rough estimate with the CSM formula above and the Ministry’s example, which works out to Rs. 12,000 in material cost for a single phase 3 kW house 80 metres from the pole. For an exact figure, wait for your demand notice or ask your subdivision office.
How to Check and Download Your Demand Notice
Once your demand notice is issued, you can print it yourself instead of waiting for a paper copy.
Printing It From the IESCO ENC Portal
- Go to iesco.enc.com.pk. The main portal at enc.com.pk tells IESCO consumers to use this address.
- Click Track, choose New Connection and IESCO, and search with your tracking ID or CNIC to confirm the notice has been issued.
- Click Print DN and enter the details it asks for, such as your tracking ID.
- Print the notice or save it as a PDF.
Our IESCO new connection tracking guide explains the Track page in more detail.
Checks Before You Pay
- Check the applicant’s name, address and tracking ID.
- Check the sanctioned load matches what you applied for.
- Look at the breakdown of material, installation and security deposit.
- Note the last date for payment.
If anything looks wrong, raise it with the office before paying. Correcting a demand notice after payment is much harder.
Demand Notice Payment: Step by Step
The CSM says applicants may pay demand notices online or at designated banks. Follow the method printed on your own IESCO demand notice.
Paying at a Designated Bank
- Take the printed demand notice to a branch of a bank designated on the notice.
- Pay the full amount before the last date.
- Collect the bank’s acknowledgement receipt or stamped copy. Under the CSM, the bank receives payment as per the demand notice and issues an acknowledgement receipt.
- Photograph the paid copy and keep the original safe.
Note: the IESCO ENC portal has a Pay DN menu item, but when we opened that page it was marked “FOR LESCO CUSTOMERS ONLY”. IESCO applicants should therefore rely on the payment method shown on their own demand notice.
Uploading the Paid Demand Notice
- On iesco.enc.com.pk, click Upload DN.
- Select New Connection (or the change option for name, tariff or load).
- Enter your Tracking ID and CNIC.
- Upload a clear scan or photo of the paid demand notice.
You can also hand a copy to the Customer Facilitation Center or subdivision office handling your case.
Confirming Your Payment Was Received
Check the Track page a few days after payment to see whether your case has moved past the payment stage. If it has not:
- Confirm the paid copy was uploaded successfully.
- Take the bank receipt and demand notice to your subdivision office and ask them to update the record.
- If the matter is not resolved, register a complaint on 118 using our IESCO complaint guide.
Demand Notice Validity, Extension and Expiry
Every demand notice has a deadline, and missing it can push your case back.
30-Day Validity and Grace Period
Under clause 2.4.2 of the CSM, you get 30 days to pay a demand notice. A grace period of another 30 days may be allowed if you ask for it. The request must be made at least three days before the payment date expires. Check the last date on your notice, and if you need more time, apply to the office well before it.
Example: Bilal’s demand notice is issued on 1 April with 30 days to pay. If he cannot arrange the money, he should request the grace period by 27 April at the latest, not on 30 April.
If Your Demand Notice Expires
The CSM text we reviewed does not set out a procedure for reviving a demand notice once the payment period and any grace period have passed. If yours has expired, do not pay it at the bank without checking first. Contact the office handling your case and ask how to get your demand notice revalidated or reissued. The new amount may differ if material rates have changed.
After Payment: Installation, Load Extension and Refunds
Paying the IESCO demand notice is the step that starts the installation stage.
From Payment to Meter Installation
Under NEPRA’s Performance Standards (Distribution) Rules 2005, read with the CSM, IESCO must provide the connection within 20 days of demand notice payment for loads up to 15 kW, and within 34 days for loads above 15 kW up to 70 kW. NEPRA’s decisions also say that once a demand notice is paid in full, the company cannot raise extra charges for material price increases that happen after its own installation deadline. After installation, your first bill gives you a reference number, which you can use in our IESCO bill checker.
Demand Notices for Load Extension
If you apply to increase the sanctioned load of an existing connection, IESCO may issue a demand notice for that change too. Clause 2.14 of the CSM lists payment of capital cost where applicable and updating of the security deposit at prevailing rates. So a load extension demand notice can include extra material and a top-up to your deposit. Use the “Change of name/tariff/load” option on the IESCO ENC portal to track and upload it.
Refund of Security Deposit
Your security deposit is not lost. Under clause 5.2.6 of the CSM, it is refunded at the time of permanent disconnection if you apply for it. The refund needs approval from the load sanctioning officer, there must be no outstanding dues, and it should be processed within 30 days of your request. Keep your paid demand notice and receipts, as they prove how much deposit you paid.
Frequently Asked Questions
What is an IESCO demand notice?
It is IESCO’s formal notice of the charges, such as material, installation and security deposit, that you must pay before a new connection or load extension is provided.
How can I download my IESCO demand notice?
Open iesco.enc.com.pk, check your case with Track, then use Print DN and enter the requested details, such as your tracking ID.
How long is an IESCO demand notice valid?
Under the CSM, you have 30 days to pay. A further 30-day grace period may be allowed if you request it at least three days before expiry.
Can I pay my IESCO demand notice online?
The CSM allows online or designated bank payment, but the portal’s Pay DN page is marked for LESCO customers only. Use the payment method printed on your IESCO demand notice.
Is the security deposit refundable?
Yes. It is refunded on permanent disconnection if you apply, have no outstanding dues and the load sanctioning officer approves it, within 30 days of your request.
Conclusion
The IESCO demand notice is the bridge between your application and your new meter. Print it from iesco.enc.com.pk, check every charge, and pay it at the place shown on the notice within 30 days, asking early if you need the grace period. Upload the paid copy with your tracking ID and CNIC, then watch the 20-day or 34-day installation limit. Keep every receipt, because they also support a security deposit refund if you later disconnect permanently.